Risegun Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High

₹1,499.00
FREE Shipping

Risegun Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High

  • Brand: Unbranded

Risegun Electrolytic Polarized Capacitors 20pcs 450V 22µF 105℃ Long Leads Axial Electrolytic Polarized Capacitors for Tube Amplifier, High

  • Brand: Unbranded
RRP: ₹2,599.00
Price: ₹1,499.00
You save: ₹1,100.00 (42%)
Sold by:
₹1,499.00
FREE Shipping

In stock

We accept the following payment methods

Description

Features • Superior Performance Assurance: High-quality electrolytic capacitors ensure stable performance for all your electronic projects, delivering reliability you can t • Clear Specification Markings: Each capacitor features easy-to-read specifications on its , making it convenient for quick identification and use in your applications • Enhanced Thermal Resistance: Designed to withstand heat, these capacitors provide low leakage, low loss, and low impedance, ensuring longevity and efficiency in performance • Ideal for Professionals: ly suited for electronic professionals and enthusiasts alike, these capacitors meet the demands of a wide range of projects and applications • Versatile Application Range: Compatible with various electronic devices, these polarized capacitors are an excellent choice for tube amplifiers and other high-voltage setups Features: 1、 electrolytic capacitors with stable performance 2、The specifications of the capacitors is marked on its , convenient to use 3、Heat resisting, low leakage, low loss and low impedance 4、Great choice for electronic professionals or enthusiasts 5、Suitable for a wide range of electronic applications Specification: Features: electrolytic capacitors with stable performance. The specifications of the capacitors is marked on its , convenient to use. Heat resisting, low leakage, low loss and low impedance. Great choice for electronic professionals or enthusiasts. Suitable for a wide range of electronic applications. Specification: Working Voltage: DC 450V Surge voltage: DC 500V Value: 22uf Capacitance Tolerance: ±20% Operating temperature: 105℃ Dissipation Factor: between0.24 at 20℃/120Hz Dimensions: Approx. 21 x 1m / 0.83 x 0.51in Lead type length: Tin plating copper layer Lead length: 27mm / 1.1inch Type: Polarized Quantity: 20pcs Weight: Approx. 79g Package Included: 20 x Electrolytic Capacitor Package List
  • Fruugo ID: 406101913-860940411
  • EAN: 9301540872777

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Please do not allow your child to handle this product alone to avoid swallowing or other injuries; adult supervision is recommended.
Ingredients: As shown in the figure

Delivery & Returns

Dispatched within 2 days

  • STANDARD: FREE - Delivery between Fri 24 October 2025–Thu 30 October 2025 - FREE

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
  • Shenzhenshi Desheng Wangluo Keji Youxian Gongsi
  • NO,606-23-220,MeinianGuojiGuangChangZhaoshangJiedaoNanHaidadao yixiShenzhenGuangdong
  • Shenzhen
  • CN
  • 518000
  • GoodLuck856@163.com
  • 8613164761511

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • SINO-SEAR GmbH
  • SINO-SEAR GmbH
  • Feuerbachstrasse 11, 14471 Potsdam, Germany
  • Potsdam
  • DE
  • 14471
  • info@sino-sear.com
  • 4933195130908